You don't have javascript enabled. Good luck with that.
Pencarian
JLNT Tendean-Ciledug akan Dipasangi 300 Lampu LED SS

300 LED Lamps to Be Installed at Tendean-Ciledug JLNT

Around 300 lamps type light emitting diode smart system (LED SS) will be installed along Tendean-Ciledug Non Toll Flyover (JLNT). It is conducted after road physical is completed.

Fund for lamp installation in each JLNT will spend Rp 2.7 billion

Jakarta Industry and Energy Dept. Head, Yuli Hartono disclosed each lamp has 200 watts power. Thus far it is still being prepared for e-catalog auction.

12 LED Lamps Installed at Jakarta Kejati Building

Supposedly, lamp installation at JLNT that connects with South Jakarta and South Tangerang is conducted in 2016. Because of unfinished construction, it had to be delayed.

"We will put up 300 lamps along Tendean-Cilincing JLNT. Fund for lamp installation in each JLNT will spend Rp 2.7 billion. And it will enter into auction stage," she told, Thursday (2/9).

It is targeted will be installed in the upcoming May-June. Thus it could support JLNT operational, particularly for Transjakarta bus.

Linked News
Popular News indeks
  1. Pramono Pushes to Complete Long-Delayed Pluit JLNT by March 2027

    access_time20-11-2026 remove_red_eye702 personDessy Suciati
  2. JAF 2026 Highlights Maritime Heritage and Coastal Architecture

    access_time21-11-2026 remove_red_eye691 personAnita Karyati
  3. Hosted in Sydney, Pramono Discusses Opening Australian Campuses in Jakarta

    access_time25-11-2026 remove_red_eye682 personDessy Suciati
  4. Jakarta Strengthens ASEAN Cooperation on Climate, Transport, and Youth

    access_time20-11-2026 remove_red_eye640 personFolmer
  5. BORJU Markets 200 Local Products

    access_time20-11-2026 remove_red_eye609 personAnita Karyati