You don't have javascript enabled. Good luck with that.
Pencarian
JLNT Tendean-Ciledug akan Dipasangi 300 Lampu LED SS
.
photo Nurito - Beritajakarta.id

300 LED Lamps to Be Installed at Tendean-Ciledug JLNT

Around 300 lamps type light emitting diode smart system (LED SS) will be installed along Tendean-Ciledug Non Toll Flyover (JLNT). It is conducted after road physical is completed.

Fund for lamp installation in each JLNT will spend Rp 2.7 billion

Jakarta Industry and Energy Dept. Head, Yuli Hartono disclosed each lamp has 200 watts power. Thus far it is still being prepared for e-catalog auction.

12 LED Lamps Installed at Jakarta Kejati Building

Supposedly, lamp installation at JLNT that connects with South Jakarta and South Tangerang is conducted in 2016. Because of unfinished construction, it had to be delayed.

"We will put up 300 lamps along Tendean-Cilincing JLNT. Fund for lamp installation in each JLNT will spend Rp 2.7 billion. And it will enter into auction stage," she told, Thursday (2/9).

It is targeted will be installed in the upcoming May-June. Thus it could support JLNT operational, particularly for Transjakarta bus.

Linked News
Popular News indeks
  1. Transjakarta Targets Planting 100,000 Mangroves

    access_time12-07-2025 remove_red_eye414 personBudhi Firmansyah Surapati
  2. Rano Karno Celebrates City's Anniversary with Kamal Residents

    access_time12-07-2025 remove_red_eye397 personFolmer
  3. Residents Enthusiastically Enjoy the Car Free Day in Kebayoran Lama

    access_time13-07-2025 remove_red_eye353 personTiyo Surya Sakti
  4. Traffic Engineering on Jalan Otista to Begin July 20 Due to JPO Revitalization

    access_time17-07-2025 remove_red_eye325 personAldi Geri Lumban Tobing
  5. MRT Jakarta Considers Route Expansion to South Tangerang

    access_time13-07-2025 remove_red_eye317 personAldi Geri Lumban Tobing

Hitung Mundur 22 Juni 2027

00
Hari
00
Jam
00
Menit
00
Detik