You don't have javascript enabled. Good luck with that.
Pencarian
JLNT Tendean-Ciledug akan Dipasangi 300 Lampu LED SS
.
photo Nurito - Beritajakarta.id

300 LED Lamps to Be Installed at Tendean-Ciledug JLNT

Around 300 lamps type light emitting diode smart system (LED SS) will be installed along Tendean-Ciledug Non Toll Flyover (JLNT). It is conducted after road physical is completed.

Fund for lamp installation in each JLNT will spend Rp 2.7 billion

Jakarta Industry and Energy Dept. Head, Yuli Hartono disclosed each lamp has 200 watts power. Thus far it is still being prepared for e-catalog auction.

12 LED Lamps Installed at Jakarta Kejati Building

Supposedly, lamp installation at JLNT that connects with South Jakarta and South Tangerang is conducted in 2016. Because of unfinished construction, it had to be delayed.

"We will put up 300 lamps along Tendean-Cilincing JLNT. Fund for lamp installation in each JLNT will spend Rp 2.7 billion. And it will enter into auction stage," she told, Thursday (2/9).

It is targeted will be installed in the upcoming May-June. Thus it could support JLNT operational, particularly for Transjakarta bus.

Linked News
Popular News indeks
  1. Duren Sawit PTSP Holds Door-to-Door Servies at Pondok Kelapa TPU until Thursday

    access_time15-05-2024 remove_red_eye656 personNurito
  2. Commission D: RDF Construction in Rorotan Has Many Benefits

    access_time13-05-2024 remove_red_eye546 personFolmer
  3. Tengah Urban Village PPSU Personnel Clean Fire Debris

    access_time10-05-2024 remove_red_eye531 personNurito
  4. Jalan YRS III Repairs in South Jakarta Completed

    access_time10-05-2024 remove_red_eye513 personTiyo Surya Sakti
  5. 35 Toddlers in Kedoya Selatan Received Assistance with Nutritious Additional Food

    access_time13-05-2024 remove_red_eye503 personTP Moan Simanjuntak