You don't have javascript enabled. Good luck with that.
Pencarian
JLNT Tendean-Ciledug akan Dipasangi 300 Lampu LED SS
.
photo Nurito - Beritajakarta.id

300 LED Lamps to Be Installed at Tendean-Ciledug JLNT

Around 300 lamps type light emitting diode smart system (LED SS) will be installed along Tendean-Ciledug Non Toll Flyover (JLNT). It is conducted after road physical is completed.

Fund for lamp installation in each JLNT will spend Rp 2.7 billion

Jakarta Industry and Energy Dept. Head, Yuli Hartono disclosed each lamp has 200 watts power. Thus far it is still being prepared for e-catalog auction.

12 LED Lamps Installed at Jakarta Kejati Building

Supposedly, lamp installation at JLNT that connects with South Jakarta and South Tangerang is conducted in 2016. Because of unfinished construction, it had to be delayed.

"We will put up 300 lamps along Tendean-Cilincing JLNT. Fund for lamp installation in each JLNT will spend Rp 2.7 billion. And it will enter into auction stage," she told, Thursday (2/9).

It is targeted will be installed in the upcoming May-June. Thus it could support JLNT operational, particularly for Transjakarta bus.

Linked News
Popular News indeks
  1. MSMEs Bazaar Held at Binus Anggrek Campus

    access_time30-10-2024 remove_red_eye954 personTP Moan Simanjuntak
  2. 250 High School Students in N. Jakarta Learn to Create Digital Content

    access_time01-11-2024 remove_red_eye660 personBudhi Firmansyah Surapati
  3. Satpol PP Expels Illegal Participants at Sudirman - Thamrin CFD

    access_time27-10-2024 remove_red_eye454 personBudhi Firmansyah Surapati
  4. South Jakarta City Government Accelerates Stop BABS

    access_time31-10-2024 remove_red_eye395 personTiyo Surya Sakti
  5. Traffic Arrangement Applied on Jalan Tambak

    access_time28-10-2024 remove_red_eye370 personAldi Geri Lumban Tobing